Darba laiks: 10:00 - 18:00 Brīvdienās: brīvs
Tālrunis: 26637111
OVK2E200 ventilators Ø 200 mm, zemspiediena, metāla
Phase: 1
Voltage: 220-240
Frequency: 60
Sound pressure level at 3 m distance: 49
Power consumption: 61
RPM: 2550
Protection rating: IP 24
Weight: 2.5
Maximum air capacity: 875
Current: 0.28
www.vannupasaule.lv
Tālr.:26637111
E-mail:info@vannupasaule.lv
http://www.vannupasaule.lv/produkti/skatit/prece/48928
OVK2E200 ventilators Ø 200 mm, zemspiediena, metāla
Phase: 1
Voltage: 220-240
Frequency: 60
Sound pressure level at 3 m distance: 49
Power consumption: 61
RPM: 2550
Protection rating: IP 24
Weight: 2.5
Maximum air capacity: 875
Current: 0.28
| Artikuls: OVK2E200 |
| Ražotājs: Vents (Ukraina) |
| Garantija: 2 Gadi |
Interneta santehnikas veikals: www.vannupasaule.lv | Tālr.:26637111 | E-mail:info@vannupasaule.lv
Copyright © 2015 Vannu Pasaule | Izstrādājis Art Dan | Dizains Grandem
Ielādes laiks: 0.0796
Ielikt grozā